PMO Robotics / Active Project 03
AQUA-LIFT Water Station
A solar-assisted field water station concept for treatment, safe storage, dispensing and quality monitoring during disrupted service. It is a research prototype plan—not a claim of potable-water certification.
Authority boundary: AQUA-LIFT must not be used for drinking water until the treatment train, materials, operation, maintenance and water quality are validated by qualified professionals under the applicable jurisdiction.
01 · Problem and user
Resilient water access with a measurable safety case
02 · Requirements baseline
System requirements to verify
03 · Build sequence
Prototype progression
- Bench loopNon-potable recirculation with instrumentation.
- Tank demonstrator100–250 gallon controlled setup with safe dispensing mockup.
- Monitored enduranceTarget 72-hour operation with maintenance and alarm logging.
- Qualified reviewWater-quality, electrical, safety and operator review before any live use.
04 · Planning budget
Estimate—not a quote
05 · Test gates
Evidence before service
06 · Safety boundary
Non-negotiable controls
- Label the demonstrator non-potable until qualified testing and approval.
- Prevent cross-connection and backflow into any public or private supply.
- Provide overflow containment, spill response and electrical separation.
- Secure chemicals, treatment media and maintenance access.
- Retain calibration certificates, lab reports, chain of custody and deviations.
- Use only approved water sources and disposal procedures.
07 · Qualified review gate
Ready for water-treatment and safety review
No water-quality certification, supplier quote, field partner, public-health approval or completed test is claimed.
08 · Controlled RFQ preparation
Owner approval recorded; specialist review remains required
Current boundary: Owner approval authorizes preparation of a quote-only RFQ. It does not authorize issue to suppliers, procurement, construction, potable use, field deployment or performance claims until the water-treatment, electrical/safety and operations reviews are complete.